The process

How you actually build a duplex.

Nine steps, in order, with the part nobody tells you at each one. This is the whole process from the first phone call to the day your tenant moves in.

Start at step one

Step 01

The consultation

Free, no obligation. We map your goal, your budget and which loan path fits — FHA, VA or conventional. If the honest answer is "not yet," we say that, and we tell you what would have to change.

Step 02

Get pre-approved

Before the lot, before the plan. Everything downstream depends on what a lender will actually do for you. No bank? We have connections with several and we will connect you — we are not the lender and we receive no compensation for the introduction.

Step 03

The lot

Zoning that permits two units, size and setbacks that fit the building, flood zone pulled, utilities and site conditions priced. We find it if you do not have one. A lot that fails any of those is not a bargain at any price.

Step 04

Pick the model

The living area is the same on all six. The elevation is yours. The six models are here. The lot sometimes rules one out, which is why this comes after the lot and not before it.

Step 05

The written agreement

Scope, price, selections, milestones and timeline, in writing, signed by both of us. Nothing before this point is binding on either side — and a price that is not in a signed agreement is not a price.

Step 06

Plans, survey and permits

We adapt the plan to your lot, order the survey, and file with whichever office has jurisdiction — City of New Orleans, Jefferson Parish, Kenner, Gretna, Slidell or St. Tammany. They do not move at the same speed, and we tell you which one you are in before you buy the lot.

Step 07

Construction

Ground-up, to modern code and today's wind ratings. You get milestones, not silence. This is the stage where most people's horror stories come from, and it is the stage a proven plan protects you through: the trades have built this building before.

Step 08

Appraisal and closing

A licensed appraiser determines value — not us, not your lender, and not a calculator on a website. Then you close.

Step 09

Lease-up

You move into one side, or you rent both. We refer trusted local property managers if you want one, and investors building to ten or more doors with us can apply for in-house management. More on that here.

How long does it take

Longer than buying a resale. Construction itself runs about six months once we break ground, and the permit stage before it varies by jurisdiction. You will need somewhere to live in the meantime and we will say so at step one, not step six. What we will not do is give you a timeline we do not believe.

The three places people get stuck

1. Buying the lot first. The single most expensive mistake. Zoning, flood zone and setbacks decide everything, and they are checkable before you spend a dollar.

2. Skipping pre-approval. Every plan built on a loan you have not confirmed is a guess.

3. Believing a number that is not in writing. Ours or anybody's.

Step one is a phone call

It costs nothing, commits you to nothing, and you will leave it knowing whether this works for you. That is the entire point of it.

Book the consultation

(504) 407-3199 · [email protected]

Keep reading

Where we build

Investment Property Builders is a home builder — not a lender, a mortgage broker, or a financial advisor. This page describes our general process; your project's steps, timeline and requirements depend on your lot, your lender and the authority with jurisdiction, and all of those change. Nothing here is a quote, a timeline commitment, or a guarantee. A price becomes binding only in a written agreement signed by both parties. Appraised value is determined by a licensed appraiser.

Operated by DuCar Construction, LLC — Louisiana Residential License No. 883334, Commercial License No. 63084. 638 Papworth Ave., Suite C, Metairie, LA 70005. Equal Housing Opportunity.

See our Privacy Policy, Terms of Use, SMS Consent, and Accessibility Statement.

Questions people actually ask

Straight answers. Numbers are current as of September 2026.

What are the actual steps?

Qualify with a lender, pick and verify a lot, choose a plan, sign a build agreement with a price and a schedule, permit, build, inspect, close, occupy. We walk each of those with you.

Who pulls the permits?

We do. We are a licensed Louisiana contractor — Residential 883334, Commercial 63084.

Can I change the plan?

Within reason. Changes after permitting cost time and money, so we push hard to settle selections before the drawings go in.

How do draws work during construction?

Construction financing releases funds in stages tied to completed milestones, verified by inspection. Your lender sets the schedule; we build to it.

What happens if it takes longer than planned?

You get told early, in writing, with the reason. Weather, inspections and utility connections are the usual causes. We would rather give you a real date than a comfortable one.

Still have a question? Call (504) 407-3199 or book a free consult. Hablamos español.

The Ground Under It

What the $322,000 covers on the ground — and what it does not.

Every duplex we build sits on pilings, on fill, with the floor raised above the elevation the survey calls for. Water runs past the house instead of standing under it. The base price carries a normal lot. It does not carry every lot, and we tell you which one you have before you sign anything, not after.

Included in the base price

  • Pilings. The structure is driven and set on piles, not laid on dirt.
  • Three loads of fill under the house, to bring the pad up.
  • Raised above the required elevation. We build the floor higher than the survey calls for, not level with it.

Not included — quoted after we walk your lot

  • Clearing trees and grinding the stumps.
  • Extra fill when the lot sits well below street level. A low lot needs more than three loads, and that dirt goes in before we start building.
  • Anything the topography turns up once we are standing on it.

So the honest answer to what will my lot cost is: we have to go look at it. We walk the lot, read the topography, count the trees, and tell you the real number in writing. If your lot needs work before we can build, you hear that at the start — not in the middle of the job.

Have us walk your lot

Delivered & Appraised

Three we delivered. Here is what the appraiser said they were worth.

The $410,000 figure on this site is not a projection we picked. It sits inside the range of what our last three duplexes actually appraised for, by licensed appraisers, after they were finished.

ZIPDeliveredModelLiving areaAppraised at
70122Feb 2026The Spain2,496 sq ft$405,000
70122Jun 2026The Spain2,496 sq ft$406,000
70115Jul 2026The Spain2,496 sq ft$412,000

Against a $372,000 project today — $322,000 turn-key construction plus a $50,000 lot — that is $33,000 to $40,000 of equity the day the appraisal comes back. We publish the range, not the best one.

Appraised values are set by a licensed appraiser and depend on the lot, the ZIP code and market conditions at the time. Past appraisals do not guarantee a future one. Addresses are not published.

Your Warranty

Every home we build carries the Louisiana New Home Warranty Act.

This is not a marketing promise we made up. It is state law — La. R.S. 9:3141 — and it binds every builder in Louisiana on every new home. Ask any builder you are talking to whether they put it in writing. Here is exactly what it covers.

1 year

Materials and workmanship

The home is free from defects in materials or workmanship, and from anything that does not meet the building standards.

2 years

Systems

Plumbing, electrical, heating, cooling and ventilating systems are free from defects that fail the building standards. Appliances, fixtures and equipment carry their own manufacturer warranties.

5 years

Major structural defects

The home is free from major structural defects, whether from failing the building standards or from defects in materials or workmanship.

Each period runs from the warranty commencement date. The Act sets out its own notice requirements and exclusions — we walk you through the full text before you sign, and you get a copy with your closing documents.

Source: Louisiana Revised Statutes, Title 9, Section 3144. This is a summary, not legal advice. The statute governs.